Date | 13 January 2021 |
Loan No. and Title: | L3594-MON: Sustaining Access to and Quality of Education During Economic Difficulties Project |
Contract No. and Title: | EP-07: Engineering Firm to Develop Design Drawings, Specifications, and BOQs – ITPD Model Science Lab |
Bid Validity: | 16 February 2021 |
As detailed below table, the Employer awarded the Contract to the Consultant firm whose proposals has been determined to be substantially responsive to the Request for Proposals and are further determined to be eligible and qualified to perform the Contract satisfactorily. Summary of evaluation results of all firms are shown in Table 1 and winning Consulting firm’s information is stated in Table 2.
Table 1. Evaluation results
Consultants’ names | NCCS LLC | TGT LLC | Archetype LLC |
City/Country | Mongolia | Mongolia | Mongolia |
Status: | Awarded Consultant | Evaluated Consultant | Evaluated Consultant |
Reason for Rejection/Acceptance | The firm is substantially responsive to the Request for Proposal and is evaluated as the 2nd ranked and was the next lowest proposal. | The firm is substantially responsive to the Request for Proposal and is evaluated as the 1st ranked and the lowest proposal to undertake the Contract. | The firm did not submit A Power of Attorney to sign the proposal as required in the ITC 10.2 of Data Sheet, Section of the Request for Proposals, therefore, was not evaluated further in details. |
Technical Score | 841 | 916 | - |
Price as read out | MNT36,508,200 | MNT23,325,930 | |
Final Evaluation Price | MNT36,508,200 | MNT23,325,930 | |
Final Negotiated Price | - | MNT 25,658,523 | - |
Rank | 2 | 1 | - |
Table 2. Information of the Winning Consultant
No. | Name of the Selected Consultant | Contract Price | Contract Duration | Summary Scope of the Contract Awarded |
1. | TGT LLC | MNT 25,658,523 | 4 months | Develop detailed design drawings, specifications, and BOQs of ITPD Model Science Lab including detailed technical specifications of construction materials, products and equipment, detailed and accurate bill of quantities (BOQs), detailed list of materials and cost estimation; Construction supervision as a design consultant. |